We came ask from Wales for the night to see the steels go in first thing Friday morning, a really great family day.
Saturday, July 28, 2012
Wednesday, June 20, 2012
Busy onsite
Diggers back onsite filling all the soil back in and squashing it down aswell as brickies working on the side walls.
Tuesday, June 19, 2012
Last high level photo
As the rain has stopped we took the cover of our pile of soil. This is the view from the top which should be the last high level photo before filling back in. The ground floor layout is clear to see.
Friday, June 15, 2012
Richard at the front door
The house is starting to appear out of the ground and with the basement roof/terrace we are gettinhg the view.
Friday, June 1, 2012
Garden Taking Shape
Maybe garden is not quite the right description but the mounds have been flattened so it takes less imagination to believe it will one day be a garden.
Chicken heaven to be | The basement is starting to be hidden |
Thursday, May 31, 2012
More concrete
More concrete going in at the back of the basement.

Monday, May 21, 2012
Basement terrace taking shape.
With all the basement walls up we produced a design for the retaining walls for the basement terrace. It is frightening how thick walls need to get for 2.8 metres high.

Subscribe to:
Posts (Atom)