Walls start to go up
Arrived onsite expecting to see one brickies and be able to set out the wall positions. Found two brickies one builder and loads of blocks already laid out so we could not do the measurements. Spent some time head scratching to work out the exact block layout and then measuring the walls yet again. It is amsing how many details need to be worked out that are not covered in the drawings.
The waterproofing arrived mid morning so Rob and Susan set to work putting it up on the wall before the rain came. Ended up with a full head of waterproofing clay. Great preparation for the hairdresser in the afternoon, but at least I missed the rain, Richard was not so lucky.
When I got back in the afternoon I was surprised to see wall already going up.
No comments:
Post a Comment