| |
Screed going in, has to be 20mm or more below the windo to leave space for tiling. | |
Friday, November 30, 2012
Wet screed going down
An important deadline was hit today with the wet screed going down on the ground and basement. We need to wait 2 months for it to dry so it was importatn to get it down as soon as possible. Thursday was spent pegging and taping down the pipes and sorting out heating after lots of scare stories about floating pipes and freezing weather breaking the screed.
Final tamping down, looked really weird later when all the water sat on the surface, just like a swimming pool.
Wednesday, November 28, 2012
Windows in and underfloor heating going down
Glass in the windows so getting drier. All ground and basement pipes down ready for testing and screed on Friday.
Thursday, November 15, 2012
A photo tour
Across the atrium to the kitchen | the view from the front door |
Looking up from behind the kitchen |
Wednesday, November 14, 2012
Scaffold gone off the back
The plan was for all the scaffold to go today but ......
Monday, November 12, 2012
Subscribe to:
Posts (Atom)