Friday, November 30, 2012

Wet screed going down

An important deadline was hit today with the wet screed going down on the ground and basement.  We need to wait 2 months for it to dry so it was importatn to get it down as soon as possible. Thursday was spent pegging and taping down the pipes and sorting out heating after lots of scare stories about floating pipes and freezing weather breaking the screed.

Pipes all ready
Screed going in, has to be 20mm or more below the windo to leave space for tiling.
Final tamping down, looked really weird later when all the water sat on the surface, just like a swimming pool.

No comments:

Post a Comment